Mifflin, PA interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 9 with terminal status (shown greyed).
0active projects
0active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| Z1-047 | Albright | n/r | 464 | Gas | Withdrawn |
| S44 | Mifflin County | n/r | 22 | Wind | Withdrawn |
| Y2-087 | Raystown-Lewistown 230kV | 230 | 19.6 | Wind | Withdrawn |
| X1-018 | Lewistown 230kV | 230 | 9.8 | Wind | Withdrawn |
| Z1-042 | Belleville/New Holland-Logan 46kV | 46 | 9.2 | Wind | Withdrawn |
| AF2-147 | McVeytown-Strodes Mill 46 kV | 46 | 7.9 | Solar | Withdrawn |
| AH1-445 | Belleville 46 kV | 46 | 6 | Solar | Withdrawn |
| V4-077 | Montgomery Avenue 12.47kV | 12.5 | 4.9 | Solar | Withdrawn |
| AF2-231 | Belleville 12.47 kV | 12.5 | 3 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.