Newark Energy Center

PJM queue ID Y2-019

Newark Energy Center (Y2-019) is listed in the PJM interconnection queue as a 45 MW gas project in Essex County, NJ. The filing names Essex as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 31, 2016.

Queue IDY2-019
Project nameNewark Energy Center
Status (as published)In Service
SubstationEssex
Point of interconnectionEssex 230kV
CountyEssex
StateNJ
Voltage230 kV
Capacity45 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2016-03-31
Source datasetserial

Same substation and county

Essex substation: 20 requests in the PJM queue, 6 active totaling 714 MW.

Queue IDProjectMWResourceStatus
T107Newark Energy Center625GasIn Service
X3-004Newark Energy Center35GasIn Service
G20Essex 96GasIn Service
AA2-052Essex 26kV3GasIn Service
X3-052Essex County Correctional Facility0GasIn Service
X2-050Essex 230kV660GasWithdrawn
S04Essex 230kV633GasWithdrawn
T44Essex 230kV205GasWithdrawn
Y2-083Essex 138kV198GasWithdrawn
T43Essex 230kV178GasWithdrawn
U1-097Essex 230kV100GasWithdrawn
S60Newark Boxboard63GasWithdrawn

7 more on the substation page.

Essex, NJ: 35 requests in the PJM queue, 12 active totaling 715.2 MW.

A substation with the same name is named in PJM transmission planning materials: Essex Switch (PSEG, 2 mentions).

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy45
MW capacity45
MFO755

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.