Newark Energy Center
PJM queue ID X3-004
Newark Energy Center (X3-004) is listed in the PJM interconnection queue as a 35 MW gas project in Essex County, NJ. The filing names Essex as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 31, 2016.
| Queue ID | X3-004 |
|---|---|
| Project name | Newark Energy Center |
| Status (as published) | In Service |
| Substation | Essex |
| Point of interconnection | Essex 230kV |
| County | Essex |
| State | NJ |
| Voltage | 230 kV |
| Capacity | 35 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2016-03-31 |
| Source dataset | serial |
Same substation and county
Essex substation: 20 requests in the PJM queue, 6 active totaling 714 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| T107 | Newark Energy Center | 625 | Gas | In Service |
| Y2-019 | Newark Energy Center | 45 | Gas | In Service |
| G20 | Essex 9 | 6 | Gas | In Service |
| AA2-052 | Essex 26kV | 3 | Gas | In Service |
| X3-052 | Essex County Correctional Facility | 0 | Gas | In Service |
| X2-050 | Essex 230kV | 660 | Gas | Withdrawn |
| S04 | Essex 230kV | 633 | Gas | Withdrawn |
| T44 | Essex 230kV | 205 | Gas | Withdrawn |
| Y2-083 | Essex 138kV | 198 | Gas | Withdrawn |
| T43 | Essex 230kV | 178 | Gas | Withdrawn |
| U1-097 | Essex 230kV | 100 | Gas | Withdrawn |
| S60 | Newark Boxboard | 63 | Gas | Withdrawn |
7 more on the substation page.
Essex, NJ: 35 requests in the PJM queue, 12 active totaling 715.2 MW.
A substation with the same name is named in PJM transmission planning materials: Essex Switch (PSEG, 2 mentions).
Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 35 |
| MW capacity | 35 |
| MFO | 710 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.