Rockport Unit 1
PJM queue ID R97
Rockport Unit 1 (R97) is listed in the PJM interconnection queue as a 20 MW coal project in Spencer County, IN. The filing names Rockport as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of November 1, 2011.
| Queue ID | R97 |
|---|---|
| Project name | Rockport Unit 1 |
| Status (as published) | In Service |
| Substation | Rockport |
| Point of interconnection | Rockport 765kV |
| County | Spencer |
| State | IN |
| Voltage | 765 kV |
| Capacity | 20 MW |
| Resource (as published) | Coal |
| Resource category | Coal (normalized for filtering) |
| Target commercial operation | 2011-11-01 |
| Source dataset | serial |
Same substation and county
Rockport substation: 7 requests in the PJM queue, 3 active totaling 2,240 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1156 | Rockport 765kV | 1,520 | Gas | Active |
| AG2-072 | Rockport 765 kV | 700 | Hybrid | Active |
| AE1-214 | Rockport 765 kV | 625 | Hybrid | Withdrawn |
| AF2-353 | Rockport 765 kV | 560 | Hybrid | Withdrawn |
| R44 | Rockport 765kV | 485 | Coal | Withdrawn |
| AE2-130 | Rockport 765 kV | 480 | Hybrid | Withdrawn |
Spencer, IN: 11 requests in the PJM queue, 7 active totaling 9,176 MW.
A substation with the same name is named in PJM transmission planning materials: Rockport (AEP, 2 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 20 |
| MW capacity | 20 |
| MFO | 1320 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.