Rockport 765kV (C01-1156) is listed in the PJM interconnection queue as a 1,520 MW gas project in Spencer County, IN. The filing names Rockport as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of September 30, 2030.

Queue IDC01-1156
Project nameRockport 765kV
Status (as published)Active
SubstationRockport
Point of interconnectionRockport 765kV
CountySpencer
StateIN
Voltage765 kV
Capacity1,520 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2030-09-30
Source datasetcycle

Same substation and county

Rockport substation: 7 requests in the PJM queue, 3 active totaling 2,240 MW.

Queue IDProjectMWResourceStatus
AG2-072Rockport 765 kV700HybridActive
R97Rockport Unit 120CoalIn Service
AE1-214Rockport 765 kV625HybridWithdrawn
AF2-353Rockport 765 kV560HybridWithdrawn
R44Rockport 765kV485CoalWithdrawn
AE2-130Rockport 765 kV480HybridWithdrawn

Spencer, IN: 11 requests in the PJM queue, 7 active totaling 9,176 MW.

A substation with the same name is named in PJM transmission planning materials: Rockport (AEP, 2 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperIndiana Michigan Power Company
Transmission ownerAEP
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy1612.0
MW capacity1520.0
MFO1612.0
Submitted date4/10/2026
Last updated6/19/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first