Substation Scout

Delta

PJM queue ID P04

Delta (P04) is listed in the PJM interconnection queue as a 550 MW gas project in York County, PA. The filing names Peach Bottom as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 1, 2011.

Queue IDP04
Project nameDelta
Status (as published)In Service
SubstationPeach Bottom
Point of interconnectionPeach Bottom 500kV
CountyYork
StatePA
Voltage500 kV
Capacity550 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2011-03-01
Source datasetserial

Same substation and county

Peach Bottom substation: 11 requests in the PJM queue, 8 active totaling 1,858 MW.

Queue IDProjectMWResourceStatus
Y3-043Delta York760GasIn Service
V4-045Peach Bottom Units 2 & 3206NuclearIn Service
Q47Peach Bottom - Units 2 & 3140NuclearIn Service
AA1-034Delta York70GasIn Service
G46Peach Bottom 2 & 370NuclearIn Service
AB2-175Peach Bottom Units #2 & #344NuclearPartially in Service - Under Construction
U1-010Delta18GasIn Service
N02Peach Bottom550GasWithdrawn
S22Peach Bottom 500kV550GasWithdrawn
AH1-046Peach Bottom 500 kV15SolarWithdrawn

York, PA: 76 requests in the PJM queue, 22 active totaling 2,107.2 MW.

A substation with the same name is named in PJM transmission planning materials: Peach Bottom (PECO, 10 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy550
MW capacity550
MFO557

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first