Substation Scout

Beech Ridge / Field Mtn WF

PJM queue ID M24

Beech Ridge / Field Mtn WF (M24) is listed in the PJM interconnection queue as a 37.2 MW hybrid project in Greenbrier County, WV. The filing names Grassy Falls as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 1, 2014.

Queue IDM24
Project nameBeech Ridge / Field Mtn WF
Status (as published)In Service
SubstationGrassy Falls
Point of interconnectionGrassy Falls
CountyGreenbrier
StateWV
VoltageNot reported
Capacity37.2 MW
Resource (as published)Wind; Storage
Resource categoryHybrid (normalized for filtering)
Target commercial operation2014-12-01
Source datasetserial

Same substation and county

Grassy Falls substation: 6 requests in the PJM queue, 3 active totaling 44.5 MW.

Queue IDProjectMWResourceStatus
AB1-150Beech Ridge Wind Farm6.7WindIn Service
AE1-086Beech Ridge Wind Farm0.6WindIn Service
O45University Park143Not reportedWithdrawn
N09West Greenbrier90CoalWithdrawn
Q61Grassy Falls 138kV10CoalWithdrawn

Greenbrier, WV: 11 requests in the PJM queue, 4 active totaling 89.5 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy186
MW capacity37.2
MFO186

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.