Substation Scout

Grassy Falls substation interconnection queue

3 active projects totalling 44.5 MW in the PJM queue, plus 3 with terminal status (shown greyed).

3active projects
44.5active MW
6total filed
Queue IDProjectkVMWResourceStatus
O45 University Park n/r 143 Not reported Withdrawn
N09 West Greenbrier 138 90 Coal Withdrawn
M24 Beech Ridge / Field Mtn WF n/r 37.2 Hybrid In Service
Q61 Grassy Falls 138kV 138 10 Coal Withdrawn
AB1-150 Beech Ridge Wind Farm 138 6.7 Wind In Service
AE1-086 Beech Ridge Wind Farm 138 0.6 Wind In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.