Grassy Falls substation interconnection queue
3 active projects totalling 44.5 MW in the PJM queue, plus 3 with terminal status (shown greyed).
3active projects
44.5active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| O45 | University Park | n/r | 143 | Not reported | Withdrawn |
| N09 | West Greenbrier | 138 | 90 | Coal | Withdrawn |
| M24 | Beech Ridge / Field Mtn WF | n/r | 37.2 | Hybrid | In Service |
| Q61 | Grassy Falls 138kV | 138 | 10 | Coal | Withdrawn |
| AB1-150 | Beech Ridge Wind Farm | 138 | 6.7 | Wind | In Service |
| AE1-086 | Beech Ridge Wind Farm | 138 | 0.6 | Wind | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.