Greenbrier, WV interconnection queue

4 active projects totalling 89.5 MW in the PJM queue, plus 7 with terminal status (shown greyed).

4active projects
89.5active MW
11total filed
Queue IDProjectkVMWResourceStatus
O45 University Park n/r 143 Not reported Withdrawn
N09 West Greenbrier 138 90 Coal Withdrawn
C01-1230 Nutall - Quinwood 138 kV 138 45 Solar Active
N02_AEP139 McClung 138kV 138 40 Wind Withdrawn
M24 Beech Ridge / Field Mtn WF n/r 37.2 Hybrid In Service
AG1-234 Hinton-Ronceverte 115 kV 115 30 Solar Withdrawn
AH1-376 Trillium PV I 46 16.8 Solar Withdrawn
Q61 Grassy Falls 138kV 138 10 Coal Withdrawn
AB1-150 Beech Ridge Wind Farm 138 6.7 Wind In Service
AE1-086 Beech Ridge Wind Farm 138 0.6 Wind In Service
AC1-012 Tri-State Solar 34.5 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.