Beech Ridge Wind Farm
PJM queue ID AE1-086
Beech Ridge Wind Farm (AE1-086) is listed in the PJM interconnection queue as a 0.6 MW wind project in Greenbrier County, WV. The filing names Grassy Falls as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of May 31, 2020.
| Queue ID | AE1-086 |
|---|---|
| Project name | Beech Ridge Wind Farm |
| Status (as published) | In Service |
| Substation | Grassy Falls |
| Point of interconnection | Grassy Falls 138 kV |
| County | Greenbrier |
| State | WV |
| Voltage | 138 kV |
| Capacity | 0.6 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2020-05-31 |
| Source dataset | serial |
Same substation and county
Grassy Falls substation: 6 requests in the PJM queue, 3 active totaling 44.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| M24 | Beech Ridge / Field Mtn WF | 37.2 | Hybrid | In Service |
| AB1-150 | Beech Ridge Wind Farm | 6.7 | Wind | In Service |
| O45 | University Park | 143 | Not reported | Withdrawn |
| N09 | West Greenbrier | 90 | Coal | Withdrawn |
| Q61 | Grassy Falls 138kV | 10 | Coal | Withdrawn |
Greenbrier, WV: 11 requests in the PJM queue, 4 active totaling 89.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 5 |
| MW capacity | 0.6 |
| MFO | 55.6 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.