Clavert Cliffs 1 and 2

PJM queue ID M04

Clavert Cliffs 1 and 2 (M04) is listed in the PJM interconnection queue as a 63 MW nuclear project in Calvert County, MD. The filing names Calvert Cliffs as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 30, 2005.

Queue IDM04
Project nameClavert Cliffs 1 and 2
Status (as published)In Service
SubstationCalvert Cliffs
Point of interconnectionCalvert Cliffs
CountyCalvert
StateMD
VoltageNot reported
Capacity63 MW
Resource (as published)Nuclear
Resource categoryNuclear (normalized for filtering)
Target commercial operation2005-06-30
Source datasetserial

Same substation and county

Calvert Cliffs substation: 9 requests in the PJM queue, 5 active totaling 307.2 MW.

Queue IDProjectMWResourceStatus
C01-1262Calvert Cliffs 500 kV206.8NuclearActive
AC1-008Calvert Cliffs Units 1 and 2 (f/k/a PJM Queue M04)19.2NuclearIn Service
AC2-017Calvert Cliffs Units 1 and 2 (f/k/a PJM Queue M04)11.1NuclearIn Service
AE1-001Calvert Cliffs Units 1 and 2 (f/k/a PJM Queue M04)7.1NuclearIn Service
Q48Calvert Cliffs Nuclear Power Plant Unit 31,640NuclearWithdrawn
Q77Calvert Cliffs1,640NuclearWithdrawn
V2-042Calvert Cliffs 500kV1,640NuclearWithdrawn
K27Calvert Cliffs 500kV35NuclearWithdrawn

Calvert, MD: 13 requests in the PJM queue, 6 active totaling 307.2 MW.

A substation with the same name is named in PJM transmission planning materials: Calvert Cliffs (BGE, 1 mention).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy63
MFO1740

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first