Calvert, MD interconnection queue
6 active projects totalling 307.2 MW in the PJM queue, plus 7 with terminal status (shown greyed).
6active projects
307.2active MW
13total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| Q48 | Calvert Cliffs Nuclear Power Plant Unit 3 | n/r | 1,640 | Nuclear | Withdrawn |
| Q77 | Calvert Cliffs | n/r | 1,640 | Nuclear | Withdrawn |
| V2-042 | Calvert Cliffs 500kV | 500 | 1,640 | Nuclear | Withdrawn |
| C01-1262 | Calvert Cliffs 500 kV | 500 | 206.8 | Nuclear | Active |
| AH2-423 | Sollers 230kV | 230 | 180 | Battery | Withdrawn |
| M04 | Clavert Cliffs 1 and 2 | n/r | 63 | Nuclear | In Service |
| K27 | Calvert Cliffs 500kV | 500 | 35 | Nuclear | Withdrawn |
| AC1-008 | Calvert Cliffs Units 1 and 2 (f/k/a PJM Queue M04) | 500 | 19.2 | Nuclear | In Service |
| AC2-017 | Calvert Cliffs Units 1 and 2 (f/k/a PJM Queue M04) | 500 | 11.1 | Nuclear | In Service |
| AE1-001 | Calvert Cliffs Units 1 and 2 (f/k/a PJM Queue M04) | 500 | 7.1 | Nuclear | In Service |
| I05 | Whiteoak (sub153) 13kV | 13 | 6 | Gas | Withdrawn |
| AG2-050 | CHESAPEAKE BEACH BESS | 13.8 | 0 | Other | In Service |
| H05_MTX9 | Not reported | n/r | 0 | Not reported | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.