Calvert Cliffs 500 kV
PJM queue ID C01-1262
Calvert Cliffs 500 kV (C01-1262) is listed in the PJM interconnection queue as a 206.8 MW nuclear project in Calvert County, MD. The filing names Calvert Cliffs as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of March 28, 2030.
| Queue ID | C01-1262 |
|---|---|
| Project name | Calvert Cliffs 500 kV |
| Status (as published) | Active |
| Substation | Calvert Cliffs |
| Point of interconnection | Calvert Cliffs 500 kV |
| County | Calvert |
| State | MD |
| Voltage | 500 kV |
| Capacity | 206.8 MW |
| Resource (as published) | Nuclear |
| Resource category | Nuclear (normalized for filtering) |
| Target commercial operation | 2030-03-28 |
| Source dataset | cycle |
Same substation and county
Calvert Cliffs substation: 9 requests in the PJM queue, 5 active totaling 307.2 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| M04 | Clavert Cliffs 1 and 2 | 63 | Nuclear | In Service |
| AC1-008 | Calvert Cliffs Units 1 and 2 (f/k/a PJM Queue M04) | 19.2 | Nuclear | In Service |
| AC2-017 | Calvert Cliffs Units 1 and 2 (f/k/a PJM Queue M04) | 11.1 | Nuclear | In Service |
| AE1-001 | Calvert Cliffs Units 1 and 2 (f/k/a PJM Queue M04) | 7.1 | Nuclear | In Service |
| Q48 | Calvert Cliffs Nuclear Power Plant Unit 3 | 1,640 | Nuclear | Withdrawn |
| Q77 | Calvert Cliffs | 1,640 | Nuclear | Withdrawn |
| V2-042 | Calvert Cliffs 500kV | 1,640 | Nuclear | Withdrawn |
| K27 | Calvert Cliffs 500kV | 35 | Nuclear | Withdrawn |
Calvert, MD: 13 requests in the PJM queue, 6 active totaling 307.2 MW.
A substation with the same name is named in PJM transmission planning materials: Calvert Cliffs (BGE, 1 mention).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Calvert Cliffs Nuclear Power Plant, LLC |
|---|---|
| Transmission owner | BGE |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 210.0 |
| MW capacity | 206.8 |
| MFO | 2030.8 |
| Submitted date | 4/24/2026 |
| Last updated | 6/8/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.