Substation Scout

Calvert Cliffs substation interconnection queue

5 active projects totalling 307.2 MW in the PJM queue, plus 4 with terminal status (shown greyed).

5active projects
307.2active MW
9total filed
Queue IDProjectkVMWResourceStatus
Q48 Calvert Cliffs Nuclear Power Plant Unit 3 n/r 1,640 Nuclear Withdrawn
Q77 Calvert Cliffs n/r 1,640 Nuclear Withdrawn
V2-042 Calvert Cliffs 500kV 500 1,640 Nuclear Withdrawn
C01-1262 Calvert Cliffs 500 kV 500 206.8 Nuclear Active
M04 Clavert Cliffs 1 and 2 n/r 63 Nuclear In Service
K27 Calvert Cliffs 500kV 500 35 Nuclear Withdrawn
AC1-008 Calvert Cliffs Units 1 and 2 (f/k/a PJM Queue M04) 500 19.2 Nuclear In Service
AC2-017 Calvert Cliffs Units 1 and 2 (f/k/a PJM Queue M04) 500 11.1 Nuclear In Service
AE1-001 Calvert Cliffs Units 1 and 2 (f/k/a PJM Queue M04) 500 7.1 Nuclear In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.