Nottingham 138 kV

PJM queue ID C01-1720

Nottingham 138 kV (C01-1720) is listed in the PJM interconnection queue as a 382 MW gas project in Harrison County, OH. The filing names Nottingham as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of April 30, 2031.

Queue IDC01-1720
Project nameNottingham 138 kV
Status (as published)Active
SubstationNottingham
Point of interconnectionNottingham 138 kV
CountyHarrison
StateOH
Voltage138 kV
Capacity382 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2031-04-30
Source datasetcycle

Same substation and county

Nottingham substation: 11 requests in the PJM queue, 7 active totaling 1,855.4 MW.

Queue IDProjectMWResourceStatus
C01-1675Nottingham 138 kV382GasActive
C01-1676Nottingham 138 kV382GasActive
C01-1677Nottingham 138 kV382GasActive
AH1-580Nottingham 138 kV134SolarActive
AG2-082Nottingham 138 kV133.4SolarActive
AE2-290Nottingham Solar60SolarUnder Construction
AC1-103Harrison Power Plant1,026GasWithdrawn
AH1-724Nottingham 138 kV650GasWithdrawn
AD2-005Harrison Power Plant35GasWithdrawn
AI2-346Nottingham 138 kV20SolarWithdrawn

Harrison, OH: 14 requests in the PJM queue, 8 active totaling 2,237.4 MW.

A substation with the same name is named in PJM transmission planning materials: Nottingham (AEP, 1 mention).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperEnergy Pastures Solar Project, LLC
Transmission ownerAEP
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy382.0
MW capacity382.0
MFO382.0
Submitted date4/27/2026
Last updated6/25/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.