Nottingham 138 kV
PJM queue ID AG2-082
Nottingham 138 kV (AG2-082) is listed in the PJM interconnection queue as a 133.4 MW solar project in Harrison County, OH. The filing names Nottingham as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2029.
| Queue ID | AG2-082 |
|---|---|
| Project name | Nottingham 138 kV |
| Status (as published) | Active |
| Substation | Nottingham |
| Point of interconnection | Nottingham 138 kV |
| County | Harrison |
| State | OH |
| Voltage | 138 kV |
| Capacity | 133.4 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2029-12-31 |
| Source dataset | cycle |
Same substation and county
Nottingham substation: 11 requests in the PJM queue, 7 active totaling 1,855.4 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1675 | Nottingham 138 kV | 382 | Gas | Active |
| C01-1676 | Nottingham 138 kV | 382 | Gas | Active |
| C01-1677 | Nottingham 138 kV | 382 | Gas | Active |
| C01-1720 | Nottingham 138 kV | 382 | Gas | Active |
| AH1-580 | Nottingham 138 kV | 134 | Solar | Active |
| AE2-290 | Nottingham Solar | 60 | Solar | Under Construction |
| AC1-103 | Harrison Power Plant | 1,026 | Gas | Withdrawn |
| AH1-724 | Nottingham 138 kV | 650 | Gas | Withdrawn |
| AD2-005 | Harrison Power Plant | 35 | Gas | Withdrawn |
| AI2-346 | Nottingham 138 kV | 20 | Solar | Withdrawn |
Harrison, OH: 14 requests in the PJM queue, 8 active totaling 2,237.4 MW.
A substation with the same name is named in PJM transmission planning materials: Nottingham (AEP, 1 mention).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Energy Pastures Solar Project, LLC |
|---|---|
| Transmission owner | AEP |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Phase 3 |
| MW energy | 200.0 |
| MW capacity | 133.4 |
| MFO | 200.0 |
| Submitted date | 1/22/2021 |
| Last updated | 8/20/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.