Nottingham Solar

PJM queue ID AE2-290

Nottingham Solar (AE2-290) is listed in the PJM interconnection queue as a 60 MW solar project in Harrison County, OH. The filing names Nottingham as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of December 15, 2026.

Queue IDAE2-290
Project nameNottingham Solar
Status (as published)Under Construction
SubstationNottingham
Point of interconnectionNottingham 138 kV
CountyHarrison
StateOH
Voltage138 kV
Capacity60 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2026-12-15
Source datasetserial

Same substation and county

Nottingham substation: 11 requests in the PJM queue, 7 active totaling 1,855.4 MW.

Queue IDProjectMWResourceStatus
C01-1675Nottingham 138 kV382GasActive
C01-1676Nottingham 138 kV382GasActive
C01-1677Nottingham 138 kV382GasActive
C01-1720Nottingham 138 kV382GasActive
AH1-580Nottingham 138 kV134SolarActive
AG2-082Nottingham 138 kV133.4SolarActive
AC1-103Harrison Power Plant1,026GasWithdrawn
AH1-724Nottingham 138 kV650GasWithdrawn
AD2-005Harrison Power Plant35GasWithdrawn
AI2-346Nottingham 138 kV20SolarWithdrawn

Harrison, OH: 14 requests in the PJM queue, 8 active totaling 2,237.4 MW.

A substation with the same name is named in PJM transmission planning materials: Nottingham (AEP, 1 mention).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-21 Status change n/a Suspended → Under Construction

Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy100
MW capacity60
MFO100

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first