Nottingham substation interconnection queue

7 active projects totalling 1,855.4 MW in the PJM queue, plus 4 with terminal status (shown greyed).

7active projects
1,855.4active MW
11total filed
Queue IDProjectkVMWResourceStatus
AC1-103 Harrison Power Plant 138 1,026 Gas Withdrawn
AH1-724 Nottingham 138 kV 138 650 Gas Withdrawn
C01-1675 Nottingham 138 kV 138 382 Gas Active
C01-1676 Nottingham 138 kV 138 382 Gas Active
C01-1677 Nottingham 138 kV 138 382 Gas Active
C01-1720 Nottingham 138 kV 138 382 Gas Active
AH1-580 Nottingham 138 kV 138 134 Solar Active
AG2-082 Nottingham 138 kV 138 133.4 Solar Active
AE2-290 Nottingham Solar 138 60 Solar Suspended
AD2-005 Harrison Power Plant 138 35 Gas Withdrawn
AI2-346 Nottingham 138 kV 138 20 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.