Nottingham substation interconnection queue
7 active projects totaling 1,855.4 MW in the PJM queue, plus 4 with terminal status (shown grayed).
11 PJM queue filings name Nottingham as the point of interconnection, all in Harrison County, OH.
Target commercial operation dates as filed run from Jun 2024 to Apr 2031 (11 filings). 7 active filings target a date after November 27, 2026.
Transmission owner as filed: AEP (7 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AC1-103 | Harrison Power Plant | 138 | 1,026 | Gas | Withdrawn | Jun 2024 |
| AH1-724 | Nottingham 138 kV | 138 | 650 | Gas | Withdrawn | May 2030 |
| C01-1675 | Nottingham 138 kV | 138 | 382 | Gas | Active | Apr 2031 |
| C01-1676 | Nottingham 138 kV | 138 | 382 | Gas | Active | Apr 2031 |
| C01-1677 | Nottingham 138 kV | 138 | 382 | Gas | Active | Apr 2031 |
| C01-1720 | Nottingham 138 kV | 138 | 382 | Gas | Active | Apr 2031 |
| AH1-580 | Nottingham 138 kV | 138 | 134 | Solar | Active | Dec 2029 |
| AG2-082 | Nottingham 138 kV | 138 | 133.4 | Solar | Active | Dec 2029 |
| AE2-290 | Nottingham Solar | 138 | 60 | Solar | Under Construction | Dec 2026 |
| AD2-005 | Harrison Power Plant | 138 | 35 | Gas | Withdrawn | Jun 2024 |
| AI2-346 | Nottingham 138 kV | 138 | 20 | Solar | Withdrawn | Sep 2025 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Nottingham (AEP, 1 mention).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-09-21 | AE2-290 | Status change | n/a | Suspended → Under Construction |
Same name on other Substation Scout pages
Other sources that print a substation named “Nottingham” in OH. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- Nottingham: Expansion Tracker, PJM planning: ATSI state not printed
Other PJM queue substations in Harrison County, OH
No other substation in Harrison County, OH is named as a point of interconnection in the PJM queue.