Nottingham substation interconnection queue

7 active projects totaling 1,855.4 MW in the PJM queue, plus 4 with terminal status (shown grayed).

11 PJM queue filings name Nottingham as the point of interconnection, all in Harrison County, OH.

Target commercial operation dates as filed run from Jun 2024 to Apr 2031 (11 filings). 7 active filings target a date after November 27, 2026.

Transmission owner as filed: AEP (7 filings).

7active projects
1,855.4active MW
11total filed
Queue IDProjectkVMWResourceStatusTarget COD
AC1-103 Harrison Power Plant 138 1,026 Gas Withdrawn Jun 2024
AH1-724 Nottingham 138 kV 138 650 Gas Withdrawn May 2030
C01-1675 Nottingham 138 kV 138 382 Gas Active Apr 2031
C01-1676 Nottingham 138 kV 138 382 Gas Active Apr 2031
C01-1677 Nottingham 138 kV 138 382 Gas Active Apr 2031
C01-1720 Nottingham 138 kV 138 382 Gas Active Apr 2031
AH1-580 Nottingham 138 kV 138 134 Solar Active Dec 2029
AG2-082 Nottingham 138 kV 138 133.4 Solar Active Dec 2029
AE2-290 Nottingham Solar 138 60 Solar Under Construction Dec 2026
AD2-005 Harrison Power Plant 138 35 Gas Withdrawn Jun 2024
AI2-346 Nottingham 138 kV 138 20 Solar Withdrawn Sep 2025

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Nottingham (AEP, 1 mention).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-09-21AE2-290Status changen/a Suspended → Under Construction

Same name on other Substation Scout pages

Other sources that print a substation named “Nottingham” in OH. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.

Other PJM queue substations in Harrison County, OH

No other substation in Harrison County, OH is named as a point of interconnection in the PJM queue.

All 14 PJM queue filings in Harrison County, OH.