Rosegold Solar

PJM queue ID AF2-068

Rosegold Solar (AF2-068) is listed in the PJM interconnection queue as a 90 MW solar project in Blackford County, IN. The filing names Jay as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of March 31, 2030.

Queue IDAF2-068
Project nameRosegold Solar
Status (as published)EP
SubstationJay
Point of interconnectionJay 138 kV
CountyBlackford
StateIN
Voltage138 kV
Capacity90 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2030-03-31
Source datasetcycle

Same substation and county

Jay substation: 12 requests in the PJM queue, 5 active totaling 200 MW.

Queue IDProjectMWResourceStatus
AG1-047Sun Chief Solar Farm60SolarEngineering and Procurement
C01-1593Jay 138 kV30.8WindActive
AC2-176Bitter Ridge Wind Farm16.9WindIn Service
AG1-017Bitter Ridge Wind Farm2.3WindIn Service
AG1-006Jay 138 kV60SolarWithdrawn
AH2-371Jay 138 kV50BatteryWithdrawn
AI2-399Jay 138 kV36SolarWithdrawn
AG2-577Jay 138 kV30SolarWithdrawn
AG2-578Jay 69 kV30SolarWithdrawn
AI2-422Jay 138 kV12SolarWithdrawn
AI2-423Jay 69 kV12SolarWithdrawn

Blackford, IN: 18 requests in the PJM queue, 10 active totaling 547.4 MW.

A substation with the same name is named in PJM transmission planning materials: Jay (AEP, 1 mention).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperLeeward Renewable Energy Development, LLC
Transmission ownerAEP
Project typeGeneration Interconnection
CycleTC1
StageFINAL AGREEMENT
MW energy150.0
MW capacity90.0
MFO150.0
Submitted date1/30/2020
Last updated5/7/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first