Waller Solar I
PJM queue ID AF1-042
Waller Solar I (AF1-042) is listed in the PJM interconnection queue as a 17.1 MW solar project in Lancaster County, VA. The filing names Garner DP-Lancaster as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of December 31, 2027.
| Queue ID | AF1-042 |
|---|---|
| Project name | Waller Solar I |
| Status (as published) | Under Construction |
| Substation | Garner DP-Lancaster |
| Point of interconnection | Garner DP-Lancaster 115 kV |
| County | Lancaster |
| State | VA |
| Voltage | 115 kV |
| Capacity | 17.1 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-12-31 |
| Source dataset | serial |
Same substation and county
Garner DP-Lancaster substation: 7 requests in the PJM queue, 3 active totaling 68.7 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AD2-074 | Waller Solar I | 32.7 | Solar | Under Construction |
| AG1-038 | Waller Solar I | 18.9 | Solar | Under Construction |
| AI2-237 | Garner DP-Lancaster 115 kV | 69.3 | Solar | Withdrawn |
| AG1-147 | Merry Point Solar | 42 | Solar | Withdrawn |
| AG2-215 | Garner DP-Lancaster 115 kV | 36.9 | Solar | Withdrawn |
| AG1-146 | Merry Point Solar | 18 | Solar | Withdrawn |
Lancaster, VA: 13 requests in the PJM queue, 3 active totaling 68.7 MW.
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-09 | Status change | n/a | Engineering and Procurement → Under Construction |
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 45 |
| MW capacity | 17.1 |
| MFO | 131 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.