Substation Scout

Lancaster, VA interconnection queue

4 active projects totalling 218.7 MW in the PJM queue, plus 9 with terminal status (shown greyed).

4active projects
218.7active MW
13total filed
Queue IDProjectkVMWResourceStatus
C01-1860 Ocran 115 kV 115 150 Battery Active
AI2-237 Garner DP-Lancaster 115 kV 115 69.3 Solar Withdrawn
AC1-142 Garner-Lancaster 115kV 115 57 Solar Withdrawn
AG1-147 Merry Point Solar 115 42 Solar Withdrawn
AG2-215 Garner DP-Lancaster 115 kV 115 36.9 Solar Withdrawn
AD2-074 Waller Solar I 115 32.7 Solar Under Construction
AF2-362 Not reported n/r 30 Solar Withdrawn
AI2-278 Garner Delivery Point - Lancaster 115 kV 115 30 Battery Withdrawn
AG2-366 Garner Delivery Point - Lancaster 115 kV 115 20 Battery Withdrawn
AG1-038 Waller Solar I 115 18.9 Solar Engineering and Procurement
AG1-146 Merry Point Solar 115 18 Solar Withdrawn
AF1-042 Waller Solar I 115 17.1 Solar Engineering and Procurement
AG2-005 Garner-Lancaster 115 kV 115 8.4 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.