Waller Solar I

PJM queue ID AD2-074

Waller Solar I (AD2-074) is listed in the PJM interconnection queue as a 32.7 MW solar project in Lancaster County, VA. The filing names Garner DP-Lancaster as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of December 31, 2027.

Queue IDAD2-074
Project nameWaller Solar I
Status (as published)Under Construction
SubstationGarner DP-Lancaster
Point of interconnectionGarner DP-Lancaster 115 kV
CountyLancaster
StateVA
Voltage115 kV
Capacity32.7 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2027-12-31
Source datasetserial

Same substation and county

Garner DP-Lancaster substation: 7 requests in the PJM queue, 3 active totaling 68.7 MW.

Queue IDProjectMWResourceStatus
AG1-038Waller Solar I18.9SolarUnder Construction
AF1-042Waller Solar I17.1SolarUnder Construction
AI2-237Garner DP-Lancaster 115 kV69.3SolarWithdrawn
AG1-147Merry Point Solar42SolarWithdrawn
AG2-215Garner DP-Lancaster 115 kV36.9SolarWithdrawn
AG1-146Merry Point Solar18SolarWithdrawn

Lancaster, VA: 13 requests in the PJM queue, 3 active totaling 68.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy86
MW capacity32.68
MFO86

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.