Drake Storage
PJM queue ID AF1-018
Drake Storage (AF1-018) is listed in the PJM interconnection queue as a 40 MW battery project in Middlesex County, VA. The filing names Harmony Village as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of March 1, 2026.
| Queue ID | AF1-018 |
|---|---|
| Project name | Drake Storage |
| Status (as published) | Engineering and Procurement |
| Substation | Harmony Village |
| Point of interconnection | Harmony Village 230 kV |
| County | Middlesex |
| State | VA |
| Voltage | 230 kV |
| Capacity | 40 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2026-03-01 |
| Source dataset | serial |
Same substation and county
Harmony Village substation: 8 requests in the PJM queue, 3 active totaling 89 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AE2-041 | Drake Storage | 40 | Battery | Engineering and Procurement |
| AD1-063 | Puller Solar | 9 | Solar | In Service |
| AH1-364 | Harmony Village 230kV | 68 | Battery | Withdrawn |
| AG1-057 | Harmony Village 230 kV | 20 | Battery | Withdrawn |
| AC2-073 | Church View | 13.3 | Solar | Withdrawn |
| AH1-079 | Harmony Village 34.5kV | 12 | Solar | Withdrawn |
| AE2-268 | Harmony Village 34 kV | 9.6 | Solar | Withdrawn |
Middlesex, VA: 9 requests in the PJM queue, 3 active totaling 89 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 40 |
| MW capacity | 40 |
| MFO | 80 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.