Substation Scout

Middlesex, VA interconnection queue

3 active projects totalling 89 MW in the PJM queue, plus 6 with terminal status (shown greyed).

3active projects
89active MW
9total filed
Queue IDProjectkVMWResourceStatus
AH1-364 Harmony Village 230kV 230 68 Battery Withdrawn
AE2-041 Drake Storage 230 40 Battery Engineering and Procurement
AF1-018 Drake Storage 230 40 Battery Engineering and Procurement
AG1-057 Harmony Village 230 kV 230 20 Battery Withdrawn
AC2-073 Church View 35 13.3 Solar Withdrawn
AC2-163 Harmony Village-Dunnsville 34.5kV 34.5 12.8 Solar Withdrawn
AH1-079 Harmony Village 34.5kV 34.5 12 Solar Withdrawn
AE2-268 Harmony Village 34 kV 34 9.6 Solar Withdrawn
AD1-063 Puller Solar 34.5 9 Solar In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.