Harmony Village substation interconnection queue
3 active projects totaling 89 MW in the PJM queue, plus 5 with terminal status (shown grayed).
8 PJM queue filings name Harmony Village as the point of interconnection, all in Middlesex County, VA.
Target commercial operation dates as filed run from Dec 2018 to Dec 2026 (8 filings). 1 active filing targets a date after November 27, 2026.
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH1-364 | Harmony Village 230kV | 230 | 68 | Battery | Withdrawn | Dec 2025 |
| AE2-041 | Drake Storage | 230 | 40 | Battery | Engineering and Procurement | Dec 2026 |
| AF1-018 | Drake Storage | 230 | 40 | Battery | Engineering and Procurement | Mar 2026 |
| AG1-057 | Harmony Village 230 kV | 230 | 20 | Battery | Withdrawn | Dec 2023 |
| AC2-073 | Church View | 35 | 13.3 | Solar | Withdrawn | Dec 2021 |
| AH1-079 | Harmony Village 34.5kV | 34.5 | 12 | Solar | Withdrawn | Dec 2024 |
| AE2-268 | Harmony Village 34 kV | 34 | 9.6 | Solar | Withdrawn | Dec 2021 |
| AD1-063 | Puller Solar | 34.5 | 9 | Solar | In Service | Dec 2018 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Harmony Village” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- Harmony Village Substation: Expansion Tracker, PJM planning: DOM state not printed
Other PJM queue substations in Middlesex County, VA
No other substation in Middlesex County, VA is named as a point of interconnection in the PJM queue.