Puller Solar

PJM queue ID AD1-063

Puller Solar (AD1-063) is listed in the PJM interconnection queue as a 9 MW solar project in Middlesex County, VA. The filing names Harmony Village as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 1, 2018.

Queue IDAD1-063
Project namePuller Solar
Status (as published)In Service
SubstationHarmony Village
Point of interconnectionHarmony Village 34.5 kV
CountyMiddlesex
StateVA
Voltage34.5 kV
Capacity9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2018-12-01
Source datasetserial

Same substation and county

Harmony Village substation: 8 requests in the PJM queue, 3 active totaling 89 MW.

Queue IDProjectMWResourceStatus
AE2-041Drake Storage40BatteryEngineering and Procurement
AF1-018Drake Storage40BatteryEngineering and Procurement
AH1-364Harmony Village 230kV68BatteryWithdrawn
AG1-057Harmony Village 230 kV20BatteryWithdrawn
AC2-073Church View13.3SolarWithdrawn
AH1-079Harmony Village 34.5kV12SolarWithdrawn
AE2-268Harmony Village 34 kV9.6SolarWithdrawn

Middlesex, VA: 9 requests in the PJM queue, 3 active totaling 89 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy15
MW capacity9
MFO15

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.