Wythe County Solar Project
PJM queue ID AC2-123
Wythe County Solar Project (AC2-123) is listed in the PJM interconnection queue as a 44.6 MW solar project in Wythe County, VA. The filing names Jacksons Ferry as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 30, 2025.
| Queue ID | AC2-123 |
|---|---|
| Project name | Wythe County Solar Project |
| Status (as published) | In Service |
| Substation | Jacksons Ferry |
| Point of interconnection | Jacksons Ferry 138kV |
| County | Wythe |
| State | VA |
| Voltage | 138 kV |
| Capacity | 44.6 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2025-03-30 |
| Source dataset | serial |
Same substation and county
Jacksons Ferry substation: 2 requests in the PJM queue, 2 active totaling 75.9 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AE2-326 | Wythe County Solar Project | 31.3 | Battery | Engineering and Procurement |
Wythe, VA: 11 requests in the PJM queue, 4 active totaling 486.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 75 |
| MW capacity | 44.6 |
| MFO | 75 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.