Wythe, VA interconnection queue
4 active projects totalling 486.5 MW in the PJM queue, plus 7 with terminal status (shown greyed).
4active projects
486.5active MW
11total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1879 | Wythe 138 kV | 138 | 300 | Battery | Active |
| AH2-069 | JAckson Ferry - Progress Park 138 kV | 138 | 150 | Solar | Withdrawn |
| C01-1984 | Mount Airy - Wythe 138 kV | 138 | 110.6 | Solar | Active |
| AG2-462 | Progress Park - Glen Lyn 138 kV | 138 | 78 | Hybrid | Withdrawn |
| AH2-382 | Wythe – Mount Airy 138 kV | 138 | 75 | Hybrid | Withdrawn |
| AE2-196 | Mt. Airy-Wythe 138 kV | 138 | 56 | Solar | Withdrawn |
| AC2-123 | Wythe County Solar Project | 138 | 44.6 | Solar | In Service |
| AE2-326 | Wythe County Solar Project | 138 | 31.3 | Battery | Engineering and Procurement |
| AG2-432 | Mount Airy - Wythe 138 kV | 138 | 30 | Solar | Withdrawn |
| AC1-155 | Mt. Airy 34.5kV | 34.5 | 19 | Solar | Withdrawn |
| AC2-089 | Silverside Solar | 34.5 | 8.8 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.