Wythe, VA interconnection queue

4 active projects totalling 486.5 MW in the PJM queue, plus 7 with terminal status (shown greyed).

4active projects
486.5active MW
11total filed
Queue IDProjectkVMWResourceStatus
C01-1879 Wythe 138 kV 138 300 Battery Active
AH2-069 JAckson Ferry - Progress Park 138 kV 138 150 Solar Withdrawn
C01-1984 Mount Airy - Wythe 138 kV 138 110.6 Solar Active
AG2-462 Progress Park - Glen Lyn 138 kV 138 78 Hybrid Withdrawn
AH2-382 Wythe – Mount Airy 138 kV 138 75 Hybrid Withdrawn
AE2-196 Mt. Airy-Wythe 138 kV 138 56 Solar Withdrawn
AC2-123 Wythe County Solar Project 138 44.6 Solar In Service
AE2-326 Wythe County Solar Project 138 31.3 Battery Engineering and Procurement
AG2-432 Mount Airy - Wythe 138 kV 138 30 Solar Withdrawn
AC1-155 Mt. Airy 34.5kV 34.5 19 Solar Withdrawn
AC2-089 Silverside Solar 34.5 8.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.