Juliet Energy

PJM queue ID AF2-126

Juliet Energy (AF2-126) is listed in the PJM interconnection queue as a 8 MW solar project in Wood County, OH. The filing names Weston II as its point of interconnection. PJM lists its status as “UC-ISP”, with a target commercial operation date of June 1, 2028.

Queue IDAF2-126
Project nameJuliet Energy
Status (as published)UC-ISP
SubstationWeston II
Point of interconnectionWeston 69 kV II
CountyWood
StateOH
Voltage69 kV
Capacity8 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2028-06-01
Source datasetcycle

Same substation and county

Wood, OH: 19 requests in the PJM queue, 7 active totaling 887.6 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperJuliet Energy Project, LLC
Transmission ownerATSI
Project typeGeneration Interconnection
CycleTC1
StageFINAL AGREEMENT
MW energy12.0
MW capacity8.0
MFO62.0
Submitted date2/28/2020
Last updated10/1/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.