Bethlehem Energy Center
PJM queue ID AH1-128
Bethlehem Energy Center (AH1-128) is listed in the PJM interconnection queue as a battery request filed at 0 MW (a net change or energy-only filing) in Prince William County, VA. The filing names Railroad as its point of interconnection. PJM lists its status as “UC”, with a target commercial operation date of June 2, 2026.
| Queue ID | AH1-128 |
|---|---|
| Project name | Bethlehem Energy Center |
| Status (as published) | UC |
| Substation | Railroad |
| Point of interconnection | Railroad 34.5kV |
| County | Prince William |
| State | VA |
| Voltage | 34.5 kV |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2026-06-02 |
| Source dataset | cycle |
Same substation and county
Railroad substation: 2 requests in the PJM queue, 2 active totaling 0 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AH1-127 | Railroad Energy Center | 0 | Battery | UC |
Prince William, VA: 39 requests in the PJM queue, 14 active totaling 644 MW.
A substation with the same name is named in PJM transmission planning materials: Railroad (DOM, 5 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Bethlehem Energy Center, LLC |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Final Agreement |
| MW energy | 20.0 |
| MW capacity | 0.0 |
| MFO | 20.0 |
| Submitted date | 8/23/2021 |
| Last updated | 2/27/2026 |