Top Hat Wind Energy Center
PJM queue ID AC1-053
Top Hat Wind Energy Center (AC1-053) is listed in the PJM interconnection queue as a 26 MW wind project in Logan County, IL. The filing names Lanesville-Brokaw as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 15, 2025.
| Queue ID | AC1-053 |
|---|---|
| Project name | Top Hat Wind Energy Center |
| Status (as published) | In Service |
| Substation | Lanesville-Brokaw |
| Point of interconnection | Lanesville-Brokaw |
| County | Logan |
| State | IL |
| Voltage | Not reported |
| Capacity | 26 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2025-12-15 |
| Source dataset | serial |
Same substation and county
Lanesville-Brokaw substation: 4 requests in the PJM queue, 1 active totaling 26 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AI2-166 | Lanesville-Brokaw | 78 | Wind | Withdrawn |
| AI2-167 | Lanesville-Brokaw 345 kV | 78 | Wind | Withdrawn |
| AG1-236 | Ramble Wind | 23.4 | Wind | Withdrawn |
Logan, IL: 14 requests in the PJM queue, 6 active totaling 156 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 200 |
| MW capacity | 26 |
| MFO | 200 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.