TSS 987 Beason 345 kV
PJM queue ID C01-1067
TSS 987 Beason 345 kV (C01-1067) is listed in the PJM interconnection queue as a 78 MW wind project in Logan County, IL. The filing names TSS 987 Beason as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 6, 2026.
| Queue ID | C01-1067 |
|---|---|
| Project name | TSS 987 Beason 345 kV |
| Status (as published) | Active |
| Substation | TSS 987 Beason |
| Point of interconnection | TSS 987 Beason 345 kV |
| County | Logan |
| State | IL |
| Voltage | 345 kV |
| Capacity | 78 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2026-06-06 |
| Source dataset | cycle |
Same substation and county
Logan, IL: 14 requests in the PJM queue, 6 active totaling 156 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Appalachian Power Company |
|---|---|
| Transmission owner | ComEd |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 0.0 |
| MW capacity | 78.0 |
| MFO | 200.0 |
| Submitted date | 4/24/2026 |
| Last updated | 6/10/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.