Central LF Units 1-4

PJM queue ID T12

Central LF Units 1-4 (T12) is listed in the PJM interconnection queue as a 4 MW gas project in Kent County, DE. The filing names Kent-Harrington as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of August 14, 2007.

Queue IDT12
Project nameCentral LF Units 1-4
Status (as published)In Service
SubstationKent-Harrington
Point of interconnectionKent-Harrington 69kV
CountyKent
StateDE
Voltage69 kV
Capacity4 MW
Resource (as published)Methane
Resource categoryGas (normalized for filtering)
Target commercial operation2007-08-14
Source datasetserial

Same substation and county

Kent-Harrington substation: 2 requests in the PJM queue, 2 active totaling 8 MW.

Queue IDProjectMWResourceStatus
N16Central Landfill Units 1-44GasIn Service

Kent, DE: 34 requests in the PJM queue, 13 active totaling 320.2 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy4
MW capacity4
MFO4.25

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.