Sweetleaf Solar (AD1-057) is listed in the PJM interconnection queue as a 21.7 MW solar project in Halifax County, NC. The filing names Hornertown-Hathaway as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of January 28, 2027.
| Queue ID | AD1-057 |
|---|---|
| Project name | Sweetleaf Solar |
| Status (as published) | Engineering and Procurement |
| Substation | Hornertown-Hathaway |
| Point of interconnection | Hornertown-Hathaway 230 kV |
| County | Halifax |
| State | NC |
| Voltage | 230 kV |
| Capacity | 21.7 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2027-01-28 |
| Source dataset | serial |
Same substation and county
Hornertown-Hathaway substation: 2 requests in the PJM queue, 2 active totaling 60.6 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AD1-056 | Sweetleaf Solar | 38.9 | Solar | Engineering and Procurement |
Halifax, NC: 22 requests in the PJM queue, 8 active totaling 355.8 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 33 |
| MW capacity | 21.7 |
| MFO | 93 |