Bynums Bridge 115 kV
PJM queue ID C01-1464
Bynums Bridge 115 kV (C01-1464) is listed in the PJM interconnection queue as a 49.6 MW battery project in Halifax County, NC. The filing names Bynums Bridge as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of March 1, 2029.
| Queue ID | C01-1464 |
|---|---|
| Project name | Bynums Bridge 115 kV |
| Status (as published) | Active |
| Substation | Bynums Bridge |
| Point of interconnection | Bynums Bridge 115 kV |
| County | Halifax |
| State | NC |
| Voltage | 115 kV |
| Capacity | 49.6 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-03-01 |
| Source dataset | cycle |
Same substation and county
Halifax, NC: 22 requests in the PJM queue, 8 active totaling 355.8 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | American Beech Solar LLC |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 0.0 |
| MW capacity | 49.6 |
| MFO | 140.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/10/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.