Foxglove Solar

PJM queue ID AD1-155

Foxglove Solar (AD1-155) is listed in the PJM interconnection queue as a 37.2 MW solar project in Frederick County, VA. The filing names Meadow Brook-Strasburg as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 30, 2024.

Queue IDAD1-155
Project nameFoxglove Solar
Status (as published)In Service
SubstationMeadow Brook-Strasburg
Point of interconnectionMeadow Brook-Strasburg 138 kV
CountyFrederick
StateVA
Voltage138 kV
Capacity37.2 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2024-06-30
Source datasetserial

Same substation and county

Frederick, VA: 23 requests in the PJM queue, 11 active totaling 615.2 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy75
MW capacity37.2
MFO75

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.