Foxglove Solar
PJM queue ID AD1-155
Foxglove Solar (AD1-155) is listed in the PJM interconnection queue as a 37.2 MW solar project in Frederick County, VA. The filing names Meadow Brook-Strasburg as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 30, 2024.
| Queue ID | AD1-155 |
|---|---|
| Project name | Foxglove Solar |
| Status (as published) | In Service |
| Substation | Meadow Brook-Strasburg |
| Point of interconnection | Meadow Brook-Strasburg 138 kV |
| County | Frederick |
| State | VA |
| Voltage | 138 kV |
| Capacity | 37.2 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2024-06-30 |
| Source dataset | serial |
Same substation and county
Frederick, VA: 23 requests in the PJM queue, 11 active totaling 615.2 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 75 |
| MW capacity | 37.2 |
| MFO | 75 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.