Woodside 500 kV (C01-1753) is listed in the PJM interconnection queue as a 150 MW battery project in Frederick County, VA. The filing names Woodside as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2031.

Queue IDC01-1753
Project nameWoodside 500 kV
Status (as published)Active
SubstationWoodside
Point of interconnectionWoodside 500 kV
CountyFrederick
StateVA
Voltage500 kV
Capacity150 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2031-12-31
Source datasetcycle

Same substation and county

Frederick, VA: 23 requests in the PJM queue, 11 active totaling 615.2 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperNextEra Energy Resources Interconnection Holdings, LLC
Transmission ownerNEET
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy150.0
MW capacity150.0
MFO150.0
Submitted date4/27/2026
Last updated10/5/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first