Mt Airy 230 kV
PJM queue ID C01-1929
Mt Airy 230 kV (C01-1929) is listed in the PJM interconnection queue as a 300 MW battery project in Frederick County, MD. The filing names Mt Airy as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2030.
| Queue ID | C01-1929 |
|---|---|
| Project name | Mt Airy 230 kV |
| Status (as published) | Active |
| Substation | Mt Airy |
| Point of interconnection | Mt Airy 230 kV |
| County | Frederick |
| State | MD |
| Voltage | 230 kV |
| Capacity | 300 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2030-12-31 |
| Source dataset | cycle |
Same substation and county
Frederick, MD: 34 requests in the PJM queue, 8 active totaling 923.1 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Old Main Storage LLC |
|---|---|
| Transmission owner | APS |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 300.0 |
| MW capacity | 300.0 |
| MFO | 300.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/8/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.