Wheatsborough Solar

PJM queue ID AE2-176

Wheatsborough Solar (AE2-176) is listed in the PJM interconnection queue as a 75 MW solar project in Erie County, OH. The filing names Groton Solar as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of April 30, 2025.

Queue IDAE2-176
Project nameWheatsborough Solar
Status (as published)In Service
SubstationGroton Solar
Point of interconnectionGroton 138 kV Solar
CountyErie
StateOH
Voltage138 kV
Capacity75 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2025-04-30
Source datasetserial

Same substation and county

Erie, OH: 12 requests in the PJM queue, 5 active totaling 262.8 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy125
MW capacity75
MFO125

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first