Groton 138 kV

PJM queue ID C01-1261

Groton 138 kV (C01-1261) is listed in the PJM interconnection queue as a 45.2 MW solar project in Erie County, OH. The filing names Groton as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 1, 2026.

Queue IDC01-1261
Project nameGroton 138 kV
Status (as published)Active
SubstationGroton
Point of interconnectionGroton 138 kV
CountyErie
StateOH
Voltage138 kV
Capacity45.2 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2026-06-01
Source datasetcycle

Same substation and county

Groton substation: 2 requests in the PJM queue, 1 active totaling 45.2 MW.

Queue IDProjectMWResourceStatus
AG1-425Groton 138 kV20BatteryWithdrawn

Erie, OH: 12 requests in the PJM queue, 5 active totaling 262.8 MW.

A substation with the same name is named in PJM transmission planning materials: Groton (ATSI, 5 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperWheatsborough Solar, LLC
Transmission ownerATSI
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy0.0
MW capacity45.2
MFO125.0
Submitted date4/27/2026
Last updated10/8/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first