Substation Scout

Firelands Wind

PJM queue ID AC2-103

Firelands Wind (AC2-103) is listed in the PJM interconnection queue as a 38.7 MW wind project in Erie County, OH. The filing names Beaver-Davis Besse I as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of July 30, 2027.

Queue IDAC2-103
Project nameFirelands Wind
Status (as published)Under Construction
SubstationBeaver-Davis Besse I
Point of interconnectionBeaver-Davis Besse 345 kV I
CountyErie
StateOH
Voltage345 kV
Capacity38.7 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Target commercial operation2027-07-30
Source datasetserial

Same substation and county

Erie, OH: 12 requests in the PJM queue, 5 active totaling 262.8 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy261.7
MW capacity38.69
MFO261.7

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.