Firelands Wind
PJM queue ID AC2-103
Firelands Wind (AC2-103) is listed in the PJM interconnection queue as a 38.7 MW wind project in Erie County, OH. The filing names Beaver-Davis Besse I as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of July 30, 2027.
| Queue ID | AC2-103 |
|---|---|
| Project name | Firelands Wind |
| Status (as published) | Under Construction |
| Substation | Beaver-Davis Besse I |
| Point of interconnection | Beaver-Davis Besse 345 kV I |
| County | Erie |
| State | OH |
| Voltage | 345 kV |
| Capacity | 38.7 MW |
| Resource (as published) | Wind |
| Resource category | Wind (normalized for filtering) |
| Target commercial operation | 2027-07-30 |
| Source dataset | serial |
Same substation and county
Erie, OH: 12 requests in the PJM queue, 5 active totaling 262.8 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 261.7 |
| MW capacity | 38.69 |
| MFO | 261.7 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.