Riverbank Energy

PJM queue ID AF2-441

Riverbank Energy (AF2-441) is listed in the PJM interconnection queue as a 80 MW battery project in Cook County, IL. The filing names Burnham as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of May 31, 2030.

Queue IDAF2-441
Project nameRiverbank Energy
Status (as published)EP
SubstationBurnham
Point of interconnectionBurnham 138kV
CountyCook
StateIL
Voltage138 kV
Capacity80 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2030-05-31
Source datasetcycle

Same substation and county

Burnham substation: 2 requests in the PJM queue, 2 active totaling 200 MW.

Queue IDProjectMWResourceStatus
C01-1332Burnham 138 kV120BatteryActive

Cook, IL: 45 requests in the PJM queue, 9 active totaling 1,488.4 MW.

A substation with the same name is named in PJM transmission planning materials: Burnham (COMED, 13 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperLincoln Reserve Energy, LLC
Transmission ownerComEd
Project typeGeneration Interconnection
CycleTC1
StageFINAL AGREEMENT
MW energy200.0
MW capacity80.0
MFO200.0
Submitted date3/31/2020
Last updated10/7/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first