City Solar (X3-005) is listed in the PJM interconnection queue as a 3.4 MW solar project in Cook County, IL. The filing names Wildwood as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2013.

Queue IDX3-005
Project nameCity Solar
Status (as published)In Service
SubstationWildwood
Point of interconnectionWildwood 12kV
CountyCook
StateIL
Voltage12 kV
Capacity3.4 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2013-06-01
Source datasetserial

Same substation and county

Cook, IL: 45 requests in the PJM queue, 9 active totaling 1,488.4 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy9
MW capacity3.4
MFO9

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.