Philipsburg-Clarence 34.5 kV
PJM queue ID AE2-129
Philipsburg-Clarence 34.5 kV (AE2-129) is listed in the PJM interconnection queue as a 12 MW solar project in Clearfield County, PA. The filing names Philipsburg-Clarence as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of November 1, 2022.
| Queue ID | AE2-129 |
|---|---|
| Project name | Philipsburg-Clarence 34.5 kV |
| Status (as published) | In Service |
| Substation | Philipsburg-Clarence |
| Point of interconnection | Philipsburg-Clarence 34.5 kV |
| County | Clearfield |
| State | PA |
| Voltage | 34.5 kV |
| Capacity | 12 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2022-11-01 |
| Source dataset | serial |
Same substation and county
Clearfield, PA: 53 requests in the PJM queue, 11 active totaling 840.5 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 20 |
| MW capacity | 12 |
| MFO | 20 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.