Substation Scout

Shillelagh Solar

PJM queue ID AC2-012

Shillelagh Solar (AC2-012) is listed in the PJM interconnection queue as a 44.8 MW solar project in City of Chesapeake, VA. The filing names Grassfield-Great Bridge as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2023.

Queue IDAC2-012
Project nameShillelagh Solar
Status (as published)In Service
SubstationGrassfield-Great Bridge
Point of interconnectionGrassfield-Great Bridge 115kV
CountyCity of Chesapeake
StateVA
Voltage115 kV
Capacity44.8 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2023-12-31
Source datasetserial

Same substation and county

City of Chesapeake, VA: 50 requests in the PJM queue, 10 active totaling 1,016 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy118
MW capacity44.8
MFO118

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first