MPG Solar
PJM queue ID AE2-263
MPG Solar (AE2-263) is listed in the PJM interconnection queue as a 47 MW solar project in Centre County, PA. The filing names Moshannon-Milesburg II as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of July 31, 2028.
| Queue ID | AE2-263 |
|---|---|
| Project name | MPG Solar |
| Status (as published) | Engineering and Procurement |
| Substation | Moshannon-Milesburg II |
| Point of interconnection | Moshannon-Milesburg 230 kV II |
| County | Centre |
| State | PA |
| Voltage | 230 kV |
| Capacity | 47 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-07-31 |
| Source dataset | serial |
Same substation and county
Centre, PA: 53 requests in the PJM queue, 9 active totaling 212.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 78.38 |
| MW capacity | 47 |
| MFO | 161.98 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.