MPG Solar

PJM queue ID AE2-262

MPG Solar (AE2-262) is listed in the PJM interconnection queue as a 50 MW solar project in Centre County, PA. The filing names Moshannon-Milesburg as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of July 31, 2028.

Queue IDAE2-262
Project nameMPG Solar
Status (as published)Engineering and Procurement
SubstationMoshannon-Milesburg
Point of interconnectionMoshannon-Milesburg 230 kV
CountyCentre
StatePA
Voltage230 kV
Capacity50 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2028-07-31
Source datasetserial

Same substation and county

Moshannon-Milesburg substation: 2 requests in the PJM queue, 1 active totaling 50 MW.

Queue IDProjectMWResourceStatus
AA1-085Centre County Wind Facility10.7WindWithdrawn

Centre, PA: 53 requests in the PJM queue, 9 active totaling 212.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy83.6
MW capacity50
MFO83.6

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.