State College Pumping Station Battery
PJM queue ID AC1-025
State College Pumping Station Battery (AC1-025) is listed in the PJM interconnection queue as a battery request filed at 0 MW (a net change or energy-only filing) in Centre County, PA. The filing names Dale Summit as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of October 31, 2018.
| Queue ID | AC1-025 |
|---|---|
| Project name | State College Pumping Station Battery |
| Status (as published) | In Service |
| Substation | Dale Summit |
| Point of interconnection | Dale Summit |
| County | Centre |
| State | PA |
| Voltage | Not reported |
| Capacity | 0 MW (0 MW as filed — net change or energy-only) |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2018-10-31 |
| Source dataset | serial |
Same substation and county
Centre, PA: 53 requests in the PJM queue, 9 active totaling 212.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 1.5 |
| MW capacity | 0 |
| MFO | 1.5 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.