State College Pumping Station Battery

PJM queue ID AC1-025

State College Pumping Station Battery (AC1-025) is listed in the PJM interconnection queue as a battery request filed at 0 MW (a net change or energy-only filing) in Centre County, PA. The filing names Dale Summit as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of October 31, 2018.

Queue IDAC1-025
Project nameState College Pumping Station Battery
Status (as published)In Service
SubstationDale Summit
Point of interconnectionDale Summit
CountyCentre
StatePA
VoltageNot reported
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2018-10-31
Source datasetserial

Same substation and county

Centre, PA: 53 requests in the PJM queue, 9 active totaling 212.9 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy1.5
MW capacity0
MFO1.5

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.