Substation Scout

Fairhaven Battery Energy Storage System

PJM queue ID AG1-063

Fairhaven Battery Energy Storage System (AG1-063) is listed in the PJM interconnection queue as a 0.7 MW battery project in Anne Arundel County, MD. The filing names Fairhaven 13,8 kV as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of September 30, 2024.

Queue IDAG1-063
Project nameFairhaven Battery Energy Storage System
Status (as published)In Service
SubstationFairhaven 13,8 kV
Point of interconnectionFairhaven 13,8 kV
CountyAnne Arundel
StateMD
VoltageNot reported
Capacity0.7 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2024-09-30
Source datasetserial

Same substation and county

Anne Arundel, MD: 29 requests in the PJM queue, 11 active totaling 1,322.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy2.5
MW capacity0.7
MFO2.5

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.