Jade Meadow (AE2-309) is listed in the PJM interconnection queue as a 11.9 MW solar project in Allegany County, MD. The filing names Carlos Junction-Lonaconing as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 22, 2024.

Queue IDAE2-309
Project nameJade Meadow
Status (as published)In Service
SubstationCarlos Junction-Lonaconing
Point of interconnectionCarlos Junction-Lonaconing 34.5 kV
CountyAllegany
StateMD
Voltage34.5 kV
Capacity11.9 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2024-03-22
Source datasetserial

Same substation and county

Allegany, MD: 23 requests in the PJM queue, 6 active totaling 190.6 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy19.84
MW capacity11.9
MFO19.84

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.