Jade Meadow
PJM queue ID AE2-309
Jade Meadow (AE2-309) is listed in the PJM interconnection queue as a 11.9 MW solar project in Allegany County, MD. The filing names Carlos Junction-Lonaconing as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 22, 2024.
| Queue ID | AE2-309 |
|---|---|
| Project name | Jade Meadow |
| Status (as published) | In Service |
| Substation | Carlos Junction-Lonaconing |
| Point of interconnection | Carlos Junction-Lonaconing 34.5 kV |
| County | Allegany |
| State | MD |
| Voltage | 34.5 kV |
| Capacity | 11.9 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2024-03-22 |
| Source dataset | serial |
Same substation and county
Allegany, MD: 23 requests in the PJM queue, 6 active totaling 190.6 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 19.84 |
| MW capacity | 11.9 |
| MFO | 19.84 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.